HMAS Success in 2009 |
|
Career (Australia) | |
---|---|
Builder: | Cockatoo Island Dockyard |
Laid down: | 9 August 1980 |
Launched: | 3 March 1984 |
Commissioned: | 23 April 1986 |
Motto: | "Strive to Win" |
Nickname: | Battle Tanker[1] |
Honours and awards: |
Battle honours: Kuwait 1991 East Timor 1999 |
Status: | Active as of 2012 |
Badge: | |
General characteristics | |
Class and type: | Durance class tanker |
Displacement: | 17,933 tonnes (full load) |
Length: | 157.2 m (516 ft) |
Beam: | 21.2 m (70 ft) |
Draught: | 8.65 m (28.4 ft) |
Propulsion: | 2 Pielstick 16 PC2-5 V 400 diesel engines, driving two shafts |
Speed: | 19 knots (35 km/h; 22 mph) |
Boats and landing craft carried: |
1 LCVP |
Complement: | 220 |
Armament: | 2 x Phalanx Mk 15 close-in weapon systems, 4 x 12.7 mm heavy machine guns |
Aircraft carried: | May carry 1 x Sea King or equivalent |
HMAS Success (OR 304) is a Durance class multi-product replenishment oiler serving in the Royal Australian Navy (RAN). Built at Cockatoo Island Dockyard in Sydney, Australia, during the 1980s, she is the only ship of the class to be constructed outside of France, and the only one to originally not serve in the Marine Nationale (French Navy). The ship was part of the Australian contribution to the 1991 Gulf War, and was deployed to East Timor in response to incidents in 1999 and 2006. The ship was fitted with a double hull during the first half of 2011, to meet International Maritime Organisation standards.
Contents |
Seeing a need to replace the ageing oiler HMAS Supply, the RAN placed an order in 1971 for a combat support ship-a replenishment vessel capable of supplying ammnition and stores in addition to fuel-to be named HMAS Protector.[2] However, concerns about the cost of construction prompted the order's cancellation in 1974.[2] Instead, the Directions Techniques Des Constructions Naval was approached about constructing a Durance class replenishment oiler for the RAN, and a design contract was awarded to the Government of France in 1977.[2] The $68.4 million (in 1978 prices) construction contract was awarded to Vickers Cockatoo Dockyard in October 1979, with ship delivery by 31 July 1983.[3]
Success was laid down by Cockatoo Island Dockyard in Sydney, New South Wales on 9 August 1980.[4] She was launched on 3 May 1984, and commissioned into the RAN on 23 April 1986.[4] Success is the largest ship to ever be built in Australia for the RAN, and is the largest ship to be built in Port Jackson (the port of Sydney).[4] She was also the last major vessel to be constructed at Cockatoo Island Dockyard.[5]
In June 1983 the contract were renegotiated while construction was underway, with the acceptance date being extended by three years and the project cost increased to $187.3 million. The cost and time overruns was primarily due to protracted dispute between the Commonwealth and the builder over the drawings and specifications received from France, with evidence that the Department of Defence underestimated the extent of the differences between the original Australian building specifications and those supplied.[3] Additional factors in the time and cost increases were a lack of tradesmen skilled in naval construction, overly bureaucratic management, and low labour productivity.[2] The final project cost was estimated at $197.41 million; the dramatic increase in cost prevented the construction of a planned second ship.[2][3]
In 1986, Success was part of the multi-national fleet that entered Sydney Harbour to mark the 75th anniversary of the RAN.[1] Prior to the ceremonial entry, Success and two other replenishment ships (one United States Navy, one Royal Navy) were tasked with replenishing the assembled fleet: a competition between the three ships saw Success replenish more vessels than the other two.[1]
Success formed part of the Australian contribution to the 1991 Gulf War.[6] The ship was deployed to East Timor as part of the Australian-led INTERFET peacekeeping taskforce from 19 September to 28 October 1999.[7] Although not recognised at the time, an overhaul of the RAN battle honours system, completed in March 2010, saw Success granted the honours "Kuwait 1991" and "East Timor 1999" for these deployments.[8][9]
In 2005, Success was one of several Australian warships to participate in Exercise Talisman Sabre 2005, a series of joint RAN-USN war games.[10][11]
During 2006, Success was deployed to East Timor as part of the Australian response to the 2006 East Timorese crisis.[12] In late November 2006, Success was one of three Australian warships sent to Fiji during the leadup to the 2006 coup d'état by Fijian military forces against Prime Minister Laisenia Qarase. Success joined HMA Ships Newcastle and Kanimbla; the other two ships having sailed in the first week of November. The three vessels were to be used in the event of an evacuation of Australian citizens and nationals, but not as a military force.[13] The task group was stood down in late December 2006, with all three ships returning to port.
On 20 February 2007, Success intercepted a boat carrying 85 Sri Lankans, who were suspected of attempting to enter Australia illegally.[14] These were the last asylum seekers to be processed under the Pacific Solution policy before its cancellation.[15]
Success was deployed as part of Operation Resolute for three months in 2008.[1] While assigned to Resolute, the vessel was deployed with several other RAN vessels to take part in RIMPAC 08, a multi-national naval exercise.[1] During RIMPAC, on the night of 23 July, Success completed her 3,000th Replenishment at Sea (RAS): a dual-replenishment of USS Chung-Hoon (port side, 2,999th RAS) and Anzac (starboard side, 3,000th RAS).[1]
On the morning of 13 March 2009, Success was one of seventeen warships involved in a ceremonial fleet entry and fleet review in Sydney Harbour, the largest collection of RAN ships since the Australian Bicentenary in 1988.[16] The replenishment ship was one of the thirteen vessels involved in the ceremonial entry through Sydney Heads, and anchored in the harbour for the review.
In May 2009, while Success was on exercise in South-East Asia, the ship's Commanding Officer was alerted to an alleged sex gambling game aboard, which challenged male sailors to record their sexual activities with female sailors in a 'ledger', and awarded them prize money based on who or where they had sex.[17][18] This was one of several incidents during the three-month deployment; two bars in Manila were damaged during shore leave, while at another bar in Qingdao, several sailors were involved in a public sex act.[19] Three male sailors were removed from Success when the ship docked in Singapore, and were sent back to Australia to participate in a formal inquiry; this inquiry was found to be flawed because of bias and the denial of support to the three accused, and a second, independent inquiry was set up under former judge Roger Gyles in February 2010.[18][19][20] The first part of Gyles' inquiry report was released in February 2011, which stated that there was an entrenched culture of sexual harassment, bullying, and predatroy sexual behaviour towards female sailors, coupled with alcohol-fuelled misconduct, particularly amongst the male sailors of the ship's marine engineering department.[19] Gyles found that although the harassment and misconduct had been occurring as early as 2004, failures to respond to earlier complaints led to a breakdown in discipline aboard Success.[19] The former judge was unable to prove the existence of the claimed ledger, but found many of the other claims to be correct, including evidence that male sailors had placed bets around having sex with a particular female sailor.[19]
At the end of 2009, the Department of Defence released a request for tender for modification of Success into a double hull vessel, allowing her to meet International Maritime Organisation standards for oil tankers.[21] The tender was awarded to Singapore-based ST Marine (a subsidiary of ST Engineering), with the conversion to be made during 2011.[21][22] The ship sailed to Singapore in November for a naval exercise, after which she was to enter dock for the 14-week conversion, but problems in the contract delayed the dockyard start date, and Success was ordered back to Sydney, via HMAS Stirling in Western Australia, so the ship's company could take leave with family while the contract was finalised.[23] Work on the ship started in late December 2010, with the main conversion work completed by the end of April 2011.[24] In May 2011, a civilian contractor working on the ship died after falling overboard.[25] Success left Singapore in late May, and returned to Sydney.[24]
The Australian Department of Defence predicts that HMAS Success will reach the end of her useful operational lifespan sometime between 2015 and 2017.[26]